Concrete Calculator

How much concrete do you need? Get cubic yards and 60 or 80 lb bag counts for a slab, patio, footing or post hole, plus cost from your price per bag or yard.

How much concrete do you need? Enter the length, width and thickness of each slab, pad, patio, driveway, footing or post hole to get the volume in cubic metres and the number of 20, 25 or 30 kg bags. Enter the weight printed on your bag for an approximate count, or the volume one bag makes for your product’s figure, and add your price per bag or per cubic metre for the material cost. Build the project from non-overlapping parts, each with its own uniform depth.How much concrete do you need? Enter the length, width and thickness of each slab, pad, patio, driveway, footing or post hole to get the volume in cubic feet or cubic yards and the number of 40, 60 or 80 lb bags. Enter the weight printed on your bag for an approximate count, or the volume one bag makes for your product’s figure, and add your price per bag or per cubic yard for the material cost. Build the project from non-overlapping parts, each with its own uniform depth.

Page units

Project name:
Concrete Project
Part 1
Uniform depth for this part. It starts at 4 in, a starting value rather than a recommendation; enter your measured depth.
LWPart 1Thickness / depth: 4 in

Closed schematic; this is not a measured boundary.

  • L: — ft
  • W: — ft
  • Thickness / depth: 4 in

Use decimal points for bag weight, volume per bag and price. Geometry and allowance use the decimal separator of the active language. Do not use grouping or exponents. Ordinary inputs accept up to two decimal places; finished yield accepts up to six.

Estimates update automatically. Press Enter to update now.

Support ToolPrairie

Found our calculator helpful? Contributions are optional; no tax receipt is issued.

Before you order

Measure each section

Use a uniform depth for each part. Add separate parts for different depths.

Avoid overlap

Count each footprint once. The calculator does not detect overlapping parts.

Confirm supplier units

Bag weight gives an approximate count. For your product’s stated mixed volume, use the advanced volume option. Confirm the price basis with your supplier.

Check the buying terms

Material cost excludes tax, delivery and other fees. Check suitability and ordering terms separately.

Prepare your measurements and purchase

Measuring Concrete: Bags or Ready-Mix?

Use a tape or measuring wheel for the footprint, record depth at several points and split sections where it changes. Keep intersecting sections and occupied spaces clear on the sketch.

How the concrete estimate works

Rectangle area is length × width; square area is side²; circle area is π × radius². Known Area uses your measured area. Custom uses a validated closed outline. Each part volume is its area × its own uniform depth. Add the part volumes, then multiply by 1 + allowance/100. Areas are reported separately; there is no project-wide assumed depth.

Use one premixed-concrete product per project. In bag-weight mode, estimated volume per bag = dry bag weight in kg × 0.5 L/kg. One lb is exactly 0.45359237 kg. This is a generic estimating assumption; actual product yields vary, and bags of cement alone are outside this method. The advanced volume option replaces the assumption with the stated volume one bag makes. Divide volume with allowance by volume per bag and round up once after aggregation. Differences from a whole bag within min(0.000000001, eight machine epsilons × max(1, quotient)) are treated as numerical equivalence. Larger fractions round up. This handles representation noise, not measurement or product uncertainty.

A bag quote multiplies the whole-bag count. A bulk quote multiplies order volume in m³ or yd³ and does not need bag yield. Quoted decimals and conversion factors are evaluated exactly, using the stored binary64 order volume; money rounds once, half-up to hundredths. The rate and unrounded cost limit is 90,071,992,547,409.90 in the quoted currency. Positive amounts below display resolution are marked rather than called free.

1 L = 0.001 m³; 1 ft³ = 0.028316846592 m³; 1 yd³ = 0.764554857984 m³. Long measurements use m, ft or yd and depth uses cm or in. Unit changes retain physical quantities; displayed rounding never changes the calculation.

Worked examples

  • A 4 m × 4 m footprint at 12.5 cm depth has 16 m² area and 2 m³ volume. With 20 kg bags, the generic 0.5 L/kg assumption gives 10 L per bag and an estimate of 200 bags. An entered product volume of 25 L per bag instead gives 80 bags. Calling the part a slab or pad makes no difference.
  • The same footprint at 50 cm depth needs 8 m³ and 320 bags at that synthetic yield. Both parts together need 10 m³ and 400 bags. These depths demonstrate the arithmetic; they are not construction recommendations.
  • For a 2 m³ project, a chosen 10% allowance gives 2.2 m³. At a synthetic 25 L/bag and 8 per bag, the estimate is 88 bags and 704. With no yield and a bulk quote of 100/m³ instead, a 2 m³ order costs 200.
  • Two parts of 0.005 m³ each at a synthetic 10 L yield together require one bag. Rounding each part separately would incorrectly require two. A quoted yield of 16.125 L gives four bags for 0.05 m³ of order volume; the quote is retained rather than rounded to 16.13.
  • A 12 ft × 12 ft footprint at 4 in depth has 144 ft² area and 48 ft³ volume, about 1.78 yd³. With 60 lb bags, the generic 0.5 L/kg assumption gives about 13.61 L per bag and an estimate of 100 bags. An entered product volume of 0.6 ft³ per bag instead gives 80 bags. Calling the part a slab or pad makes no difference.
  • The same footprint at 12 in depth needs 144 ft³ and 240 bags at that 0.6 ft³ yield. Both parts together need 192 ft³ and 320 bags. These depths demonstrate the arithmetic; they are not construction recommendations.
  • For a 54 ft³ (2 yd³) project, a chosen 10% allowance gives 59.4 ft³ (2.2 yd³). At a synthetic 0.6 ft³/bag and 8 per bag, the estimate is 99 bags and 792. With no yield and a bulk quote of 150/yd³ instead, a 2 yd³ order costs 300.
  • Two parts of 0.25 ft³ each at a synthetic 0.5 ft³ yield together require one bag. Rounding each part separately would incorrectly require two. A quoted yield of 0.375 ft³ gives three bags for 1 ft³ of order volume; the quote is retained rather than rounded to 0.38.
Measure footprint and depth separatelyThe example footprint is 4 by 4 metres, 16 square metres. Its entered depth is 12.5 centimetres. The resulting volume is 2 cubic metres.4 m × 4 m16 m² footprintSide section12.5 cm2 m³ before allowance
Measure footprint and depth separately. The example footprint is 4 by 4 metres, 16 square metres. Its entered depth is 12.5 centimetres. The resulting volume is 2 cubic metres. Side view with depth enlarged for readability. Use your project’s measured or specified depth.

Worked example: compare bag methods and a bulk quote

Metric example: use one Rectangle part. Compare a 20 kg bag using the approximate weight method with a different bag whose label states a finished yield of 17 L. Allowance and example prices are chosen inputs; enter price numbers only.

Enter these inputs

Rectangle footprint
4 m × 4 m
Thickness / depth
12.5 cm
First scenario
20 kg bag weight; 0% allowance; no price
Second scenario
Volume per bag: 17 L; $8 per bag; 0% allowance
Allowance comparison
10% with the same entered yield and bag price
Independent bulk comparison
Reset allowance to 0%; $100 per m³

Follow the calculation

  1. 4 × 4 = 16 m². Multiply by 12.5 cm, or 0.125 m: the volume is 2 m³.
  2. The approximate weight method uses 0.5 L/kg. A 20 kg bag gives about 10 L, so 2 m³ needs an estimated 200 bags. Use the product’s stated yield for the next comparison.
  3. Select the advanced Volume per bag option and enter 17 L. 2 m³ is 2000 L; divide by 17 and round upward to 118 whole bags. At $8 per bag, material cost is $944. The entered yield replaces the weight estimate.
  4. With the chosen 10% allowance, order volume becomes 2.2 m³. At 17 L per bag, round up once for the project to 130 bags; material cost is $1040.
  5. For a separate bulk comparison, reset allowance to zero and select price per m³. At $100/m³, 2 × 100 = $200. Bag details are not needed for this bulk cost.

Read the purchasing result

Base volume
2 m³
Generic weight estimate
200 bags
Entered-yield order / cost
118 bags / $944
Entered yield with allowance / cost
130 bags / $1040
Separate zero-allowance bulk quote
$200
Measure footprint in feet and depth in inchesThe imperial example is 9 by 6 ft, or 54 ft². At 4 in deep, its volume is 18 ft³, displayed as 0.67 yd³.9 × 6 ft54 ft² footprintSide section4 in18 ft³ before allowance
Measure footprint in feet and depth in inches. The imperial example is 9 by 6 ft, or 54 ft². At 4 in deep, its volume is 18 ft³, displayed as 0.67 yd³. Side view with depth enlarged for readability. Use your project’s measured or specified depth.

Imperial example: bags and a ready-mix quote

Use feet and inches for a Rectangle part. The entered yield is 0.6 ft³ per bag. The 10% allowance and example prices are chosen examples; enter price numbers only.

Enter these inputs

Rectangle
9 ft × 6 ft; 4 in depth
Bag yield
Volume per bag: 0.6 ft³; first use 0% allowance
Bag order
Then use 10% allowance; $8 per bag
Separate bulk quote
Reset allowance to 0%; $150 per yd³

Follow the calculation

  1. 9 × 6 = 54 ft². At 4 in, or one-third of a foot, the volume is 18 ft³. In cubic yards it is 18 ÷ 27, displayed as 0.67 yd³.
  2. Choose Volume per bag and ft³, then enter 0.6. With zero allowance, 18 ÷ 0.6 = 30 bags.
  3. Add the chosen 10% allowance: 18 × 1.1 = 19.8 ft³, displayed as 0.73 yd³. Divide the unrounded volume by 0.6: 33 whole bags. At $8 each, cost is $264.
  4. For a separate ready-mix quote, reset allowance to zero, select per yd³ and enter 150. Use the full 18 ÷ 27 yd³, rather than the rounded display: the material cost is $100.

Read the purchasing result

Base volume
18 ft³ / 0.67 yd³
Bags without allowance
30 bags
With allowance
19.8 ft³ / 0.73 yd³
Bag order / material cost
33 bags / $264
Separate bulk material cost
$100

Quantity estimate only. Verify product suitability and your design-specified depth separately. Cost uses the quoted currency and excludes tax, delivery and fees; no exchange conversion or supplier increment is assumed.

Common questions

How much concrete do I need?

Multiply length × width × thickness in feet to get cubic feet, then divide by 27 to get cubic yards. For a 10 ft × 10 ft slab 4 in thick: 4 in is 1/3 ft, so 10 × 10 × 1/3 = 33.33 ft³, or about 1.23 yd³. Use the thickness in your plan; the calculator starts at 4 in only as an entry to replace. Enter each separate slab, step or footing as its own part, then add any ordering allowance you choose.

How many bags of concrete do I need for a 10x10 slab?

Divide the volume by what one bag makes and round up to a whole bag. A 10 ft × 10 ft slab 4 in thick is 33.33 ft³. If your 80 lb bag states that it makes 0.6 ft³ (an example figure; check your bag), that is 33.33 ÷ 0.6 = 55.56, so 56 bags. If you enter only the 80 lb weight, the calculator uses its generic estimate of about 0.64 ft³ per bag and shows an estimated 53 bags.

How many 80 lb bags of concrete are in a cubic yard?

A cubic yard is 27 ft³, so it depends on what one bag makes. With an example yield of 0.6 ft³ per 80 lb bag, 27 ÷ 0.6 = 45 bags. With the calculator’s generic weight estimate, about 0.64 ft³ for 80 lb, it is an estimated 43 bags; for 60 lb bags, about 0.48 ft³ each, it is an estimated 57. Products differ, so enter the volume printed on your bag under Volume per bag when you have it.

How many cubic feet does an 80 lb bag of concrete make?

Check the yield on the bag or the product data sheet, because it varies by product. When you enter only the weight, the calculator assumes 0.5 L of mixed concrete per kg of dry premix: 80 lb is about 36.29 kg, so about 18.14 L or 0.64 ft³, and a 60 lb bag about 0.48 ft³. This estimate is for premixed concrete only, not bags of cement alone. Select Volume per bag to enter your product’s own figure.

How much concrete do I need for a post hole, footing or sonotube?

Choose Circle and enter the hole or tube diameter, then its depth. A 12 in diameter sonotube 48 in deep holds π × 0.5 ft × 0.5 ft × 4 ft = 3.14 ft³. Duplicate the part for each hole: 8 such holes need 25.13 ft³, about 0.93 yd³. The calculator gives the full hole volume and does not subtract a post set in the concrete. For a rectangular footing, use Rectangle with its length, width and depth.

How many square feet does a yard of concrete cover?

Divide 27 ft³ by the thickness in feet. At 4 in (1/3 ft), one cubic yard covers 27 ÷ 1/3 = 81 ft²; at 6 in (0.5 ft), it covers 54 ft². To go the other way, multiply square feet by the thickness in feet and divide by 27. If you already know the square footage, choose Custom, then Known area, and enter it with the depth.

How much does concrete cost per yard or per bag?

The calculator has no built-in prices; enter the price your supplier quotes per bag or per cubic yard. A 10 ft × 10 ft slab 4 in thick is 33.33 ÷ 27 = about 1.23 yd³, which at an example ready-mix price of 150 per yd³ costs 185.19. As 56 bags at an example price of 6 per bag, it costs 336. Delivery, small-load and other fees, tax and labor are not included; confirm them with your supplier.

Can I use this for slabs, pads and thicker pours?

Yes. All use footprint area × uniform depth. Use your measured or design-specified depth. The initial 10.16 cm is only a starting entry. The calculator does not select a minimum thickness or verify structural suitability.Yes. All use footprint area × uniform depth. Use your measured or design-specified depth. The initial 4 in is only a starting entry. The calculator does not select a minimum thickness or verify structural suitability.

I only know the bag weight. Can I estimate the bags?

Yes. Enter the weight in kg or lb. The calculator estimates 0.5 L of mixed concrete per kg of dry premix, so 20 kg is treated as about 10 L. This is an assumption, not a product guarantee. For your product’s stated figure, select Volume per bag, the advanced option, and enter its yield in L or ft³. Do not use the weight estimate for cement-only bags.

What if parts overlap or the depth varies?

Split the project into non-overlapping parts, each with uniform depth. For a known net cross-section, Known Area may be appropriate. The calculator does not remove overlaps, subtract negative parts or infer hollow and varying-depth solids.

What happens when bag details, price or allowance are missing?

Blank allowance means zero. Blank bag details leave bags unavailable; blank price leaves cost unavailable. Valid geometry still gives volume, and a bulk quote can give cost without bag details. Zero price means free. Invalid nonblank data remains an error and blocks misleading exports.

How are unit changes and supplier quotes handled?

Geometry and purchasing units are independent. Changing kg/lb or L/ft³ retains the physical quantity and original entry. Switching between weight and advanced volume clears the bag entry so you can supply the new basis. Equivalent m³/yd³ prices preserve cost and the original quote. Switching between bag and bulk pricing requires a new price quote; invalid price drafts must be corrected or cleared.

How do Custom locks and project actions work?

Lock a side or angle to hold its accepted value while unlocked geometry adjusts. Conflicts preserve accepted geometry. Add, duplicate, remove and Undo manage parts; collapsing hides controls only. Clear All returns one fresh part, preserving active unit preferences.

What is included in print and share?

Print includes every part, even collapsed parts, diagrams, depths, bag entries, the weight assumption when used, original supplier quotes and current results. Anonymous links contain measurements, bag mode and purchasing inputs, excluding names, internal IDs, drafts and stored results. Anyone with a link can read those inputs. Older volume-based links keep their original method. Calculations run locally after assets load.

Does the calculator design a concrete mix?

No. It does not determine cement, sand, aggregate or water ratios, strength, reinforcement, curing, installation procedures, delivery logistics or structural adequacy. Confirm product suitability and construction requirements independently.

Methods and worked examples were prepared independently for ToolPrairie. The 0.5 L/kg weight estimate is an explicit generic assumption, not a manufacturer promise or wet-concrete density. Product literature was reviewed to check plausibility and variation; no product catalogue, manufacturer table or external asset is distributed.