Measure each section
Use a uniform depth for each part. Add separate parts for different depths.
How much gravel do you need? Enter your area and depth to get cubic yards, tons and bags for driveways, paths and patios, including pea gravel and crushed stone.
Enter the length, width and depth of each area to get cubic metres, metric tonnes and whole bags for a driveway, path, patio or garden bed. It works for pea gravel, crushed stone, river rock and other aggregates: enter your supplier’s bulk density and bag size, because no density is assumed. Build the project from non-overlapping parts, each with a uniform depth. Depth starts at 10.16 cm; replace it with your measured depth. Estimates update after a short pause.It works for pea gravel, crushed stone, river rock, landscape rock and crusher run: enter your supplier’s bulk density and bag size, because no density is assumed. Build the project from non-overlapping parts, each with a uniform depth. Depth starts at 4 in; replace it with your measured depth. Estimates update after a short pause.
Found our calculator helpful? Contributions are optional; no tax receipt is issued.
Use a uniform depth for each part. Add separate parts for different depths.
Count each footprint once. The calculator does not detect overlapping parts.
Use metres, feet or yards for the footprint and centimetres or inches for depth. Switching metric and imperial updates geometry with appropriate units. Enter the supplier’s bulk density, bag capacity and price basis explicitly. Bag units and price basis stay unchanged when dimensions change.
Material cost excludes tax, delivery and fees. Allowance is not a compaction model.
Use a tape or measuring wheel to record the footprint, check depth at several points and split areas where it changes. Label every part so adjoining sections are counted once.
Rectangles use length × width; squares use side²; circles use π × radius². Custom sides and interior angles must reconstruct a closed, simple boundary; its area uses the shoelace formula. Known area needs no inferred outline. Each part volume is area × depth. Sum part volumes before applying the shared allowance, density, whole-bag rounding and supplier price.
Sketch a closed outline, then adjust corners, sides and interior angles. A reflex angle exceeds 180°. The calculator checks crossings and degeneracy before accepting measured values.
Whole bags = ceiling(order volume / bag volume), or ceiling(order mass / bag mass). Bulk material cost = order quantity in the selected supplier unit × price. Bag cost = whole bag count × price per bag. Calculations use unrounded values; displayed area, volume and mass use two decimals, with positive values below 0.01 shown as <0.01.
Inputs are normalized to metres, m³ and kg. 1 ft = 0.3048 m; 1 yd = 0.9144 m; 1 in = 0.0254 m; 1 cm = 0.01 m; 1 yd³ = 0.764554857984 m³; 1 ft³ = 0.028316846592 m³; 1 litre = 0.001 m³; 1 lb = 0.45359237 kg; 1 US short ton = 907.18474 kg; 1 metric tonne = 1000 kg. Density in US short tons/yd³ is multiplied by 907.18474 / 0.764554857984.
Metric example: enter two Rectangle parts. The density, 10% allowance and prices are chosen inputs. Enter price numbers only, then change the bag or price fields for each comparison.
Choose feet for length and width, inches for depth, and yd³ for volume. Enter the two sections as Rectangle parts. The density and 10% extra are chosen inputs. Enter price numbers only.
An estimate, not engineering or code approval. Confirm density, depth, compaction and purchasing terms with your supplier. Allowance is extra material, not measured compaction. Cost excludes tax, delivery and fees. Bulk quantities are not rounded to supplier increments.
Multiply length × width × depth, using the same unit for all three, then convert to the unit your supplier sells. For a 10 ft × 12 ft area 3 in deep: 3 in is 0.25 ft, so 10 × 12 × 0.25 = 30 ft³. Divide by 27 ft³ per cubic yard to get about 1.11 yd³. Enter each separate area as its own part, then add the ordering allowance you choose.
It depends on the material, because tons measure weight and cubic yards measure volume. Ask your supplier for the bulk density of the product you are buying, in US tons per cubic yard, and multiply: cubic yards × density = US tons. With an example density of 1.35 US tons/yd³, about 1.96 yd³ weighs about 2.64 US tons (5280 lb). Enter the density and the calculator shows the weight in US tons and lb.
Measure the driveway’s length and width, and use the depth in your plan or the one your supplier or installer specifies. A 12 ft × 50 ft driveway is 600 ft². At 4 in deep, that is 600 × 4 ÷ 12 = 200 ft³, about 7.41 yd³ before any allowance. If the driveway has a turnaround or a wider apron, enter it as a separate part.
Divide the volume by the depth. One cubic yard is 27 ft³; spread 3 in (0.25 ft) deep, it covers 27 ÷ 0.25 = 108 ft². For a ton, first convert weight to volume with your supplier’s density: with an example density of 1.35 US tons/yd³, 1 US ton is about 0.74 yd³, or 20 ft³, which covers about 80 ft² at 3 in deep.
Yes. The volume depends only on your measurements, so it applies to pea gravel, crushed stone, crusher run, #57 stone, river rock, drain rock and other loose aggregates. Weight and bag counts depend on the product, so enter the bulk density and bag size your supplier gives for that material. No density is assumed.
Divide the order quantity by the contents of one bag and round up to a whole bag. Bags sold by volume use the order volume directly. Bags sold by weight, such as 50 lb bags, need the supplier’s density first: an order of 2.64 US tons is 5280 lb, and 5280 ÷ 50 = 105.6, so you need 106 bags.
Enter the price your supplier quotes: per bag, per cubic yard, per metric tonne or per US short ton. The calculator shows the material cost for that basis, so you can compare a bag price with a bulk quote. Bulk orders often have minimum quantities and delivery charges, which are not included; confirm them with the supplier.
Use Rectangle, Square, Circle, Area or Custom. Area accepts a measured area directly. Custom lets you drag corners and edit ordered side lengths and interior angles. Divide complicated footprints into non-overlapping parts; no overlap detection or drainage design is provided. This tool estimates gravel quantities; it does not design concrete mix proportions.
Ask your supplier for bulk density in the stated unit and guidance for your material and project. Leave density blank to calculate volume only. Choose your own allowance between 0 and 100%; it is not a compaction prediction.
Bags use lb, kg or litres. Prices are per bag, per cubic yard, per metric tonne or per US short ton. These purchasing choices are independent of geometry units; mass/volume conversions need supplier density. For density quotes, a US short ton is 2000 lb, exactly 907.18474 kg; a tonne is 1000 kg. UK long tons are not supported.
Material cost uses your supplier’s price and selected basis: per bag, cubic yard or tonne. It uses the same currency as the entered price. Tax, delivery and other fees are excluded.
Print includes every part, its diagram, measurements and current status. A shared fragment contains inputs and preferences, excluding free-text names and stored results; it is recalculated when opened. After loading, calculations can update without a connection.
Use a decimal point, with at most two fractional digits; a third digit or overprecision paste is blocked. Grouping and exponents are not accepted. Long dimensions use m, ft or yd; depth uses cm or in. Metric/imperial changes update the project with role-appropriate units. Same-system changes affect only that field. Bag units and price basis remain independent. Converted displays use at most two decimals while calculations retain full precision.
Lock a side or interior angle to hold its entered value while unlocked geometry adjusts. Locking or unlocking an unchanged valid outline preserves its area and estimate. Conflicting constraints keep your entry visible; correct it or release a conflicting lock. Reset restores the outline. Invalid measurements cannot produce a complete estimate.
Use Add part for another entry. Duplicate copies a part and its measurements; shape switching retains its entries. Remove deletes a part and Undo removal restores it. Clear All resets project names, parts, drafts and locks while retaining unit and purchasing preferences. Minimize hides the entry body only; calculations and printing still include it.
Conversion definitions: NIST Handbook 44, 2026, Appendix C. Methods and examples independently prepared for ToolPrairie from the approved specification. No professional certification is claimed. NIST Handbook 44 (2026)